PT. Adimitra Baratama Nusantara
Mining Operations

Mining Operations

For overburden removal as well as coal extraction, larger fleets (up to 350 ton excavators and 100 ton dump trucks) are used to optimize economics of scale.

Operation

Open Cut Mining Truck & Shovel
Open Cut Mining Truck & Shovel
Open Cut Mining Truck & Shovel
Open Cut Mining Truck & Shovel
Prev Next
Coal Hauling From Pit to Stockpile
Coal Hauling From Pit to Stockpile
ROM Stockpile Run-of-Mine
ROM Stockpile Run-of-Mine
Crusher  (Primary & Secondary)  Capacity: 1,800 mtph
Crusher (Primary & Secondary) Capacity: 1,800 mtph
Main Stockpile Blending Facility
Main Stockpile Blending Facility
Overland Conveyor  (Distance: 5 km) Capacity:  1,700 mtph
Overland Conveyor (Distance: 5 km) Capacity: 1,700 mtph
ABN Port Barge loading Capacity:  1,700 mtph
ABN Port Barge loading Capacity: 1,700 mtph
Barging (300 ft) To M. Jawa 30 NM To M. Berau 65 NM
Barging (300 ft) To M. Jawa 30 NM To M. Berau 65 NM
Vessel Loading Guaranteed Load Rate: Up to 20,000 mt pwwdshinc
Vessel Loading Guaranteed Load Rate: Up to 20,000 mt pwwdshinc
Prev Next